Independent Power Plant (IPP), Tanzania

ASG (through RSS) provided two temporary power plants to support the national grid in Tanzania. The first plant of 50 MW is located in Arusha and the second plant of 55 MW is located in the capital city of Dodoma, both of which provide additional power to the grid during peak times.